I made a trip to Austria to work on a very low rate, 80 year old field that was already waterflooded and nitrogen flooded! The EOR ran out years ago. I think the team is doing an amazing job of squeezing out the last barrels. Somehow we managed to find opportunities worth an additional 10% production, mostly with beam pump optimization and acid stimulations.
Lovely, if rather too cold. |
No comments:
Post a Comment